我们使用Visual Studio在线作为我们的积压/冲刺计划系统。 现在VSO开发团队已经介绍了定义史诗的可能性,这很棒。
但问题是我已经有完整的积压功能和积压项目。 我找不到如何将这些功能分配给新创建的史诗......(如果我先创建了积压项目,并且在此之后 - 如果我创建了一个功能,那么我无法找到如何附加上述内容的方法积压项目到新创建的功能)
我被卡住了,无法找到如何完成此任务的方法。 它可能吗? 任何人都可以点亮一下吗?
We are using Visual Studio online as our backlog/sprint planning system. Now VSO development team has introduced possibility to define epics, which is great.
But the problem is that I already have full backlog with features and backlog items. I can not find a way how to assign those features to newly created epics... (the same if I have created backlog item first and after that - if I create a feature, I can't find a way how to attach that aforementioned backlog item to the newly created feature)
I am stuck and can't find a way how to accomplish this. Is it at all possible? Can anyone shed some light?
最满意答案
是的,请按照以下步骤完成此操作:
来自史诗:
打开Epics项目。 点击“功能”选项卡下的“链接到...”按钮。 选择“Child”链接类型,然后输入您要为此Epic分配的功能的ID。从功能
将“Mapping”设置为“On”,您将看到右侧面板中列出的Epics。 将该功能拖放到您要分配的Epic。或者你也可以:
打开功能项目。 点击“所有链接”标签下的“链接到...”按钮。 将“链接类型”设置为“父级”,然后输入您要分配的Epic的ID。
当您想要将积压项目分配给功能时,还可以使用上述步骤。
Yes, follow the steps below to accomplish this:
From Epics:
Open the Epics item. Click "Link to..." button under "Features" tab. Select "Child" link type and enter the ID of the feature you'd like to assign to this Epic.From Features
Set "Mapping" to "On" and you will see the Epics listed in the right panel. Drag and drop the feature to the Epic you'd like to assign.Or you can also:
Open the feature item. Click "Link to..." button under "All Links" tab. Set "Link Type" to "Parent" and enter the ID of the Epic you'd like to assign.The steps above can be also used when you want to assign backlog item to feature.
更多推荐
发布评论